A kitchen remodel that runs to a schedule.

Demolition through finish carpentry, sequenced so the room is out of service for the shortest window the cabinet lead times allow.

How long will my kitchen be unusable during a remodel?

A full kitchen remodel typically runs several weeks, driven mostly by cabinet lead times rather than site work. Covenant Builders sequences demolition, any layout or mechanical changes, cabinetry, countertops and finish work so the room is out of service for as short a window as the schedule allows.

Overview

The schedule is set by lead times, not labor

Most full kitchen remodels run several weeks, and the pacing item is almost always cabinet lead time rather than the work on site. Countertop templating cannot happen until cabinets are set, which builds a fixed wait into the middle of every project regardless of how fast the crew moves.

That is why selections get made before demolition rather than during it. A decision made under time pressure with a crew waiting costs more and is usually worse than the same decision made calmly during planning, when lead times are still workable.

Covenant Builders project in the Twin Ports

Scope

What a kitchen remodel includes

  • Demolition and disposal
  • Layout changes with the plumbing and electrical work they require
  • Cabinetry set and leveled
  • Countertop templating and installation
  • Backsplash, trim and finish carpentry
  • Coordination of licensed trades where required
  • Dust containment and daily cleanup

Kitchen Remodeling

The pacing item is cabinet lead time, not the work on site. That is why selections happen before demolition, not during it.

Covenant Builders

How it is done

Sequencing the work

Covenant Builders crew at work in the Twin Ports
  1. Demolition comes first, followed by any layout changes and the mechanical work they require. Moving a sink means moving drain plumbing, which is more involved than moving an outlet and is constrained by what is under the floor. Moving a range may mean rerouting gas and venting.

  2. With rough work inspected and closed up, cabinetry is set and leveled, countertops are templated and installed, and then backsplash, trim, hardware and finish work follow. Flooring timing depends on whether the existing floor runs under the old cabinets, which gets checked during planning rather than discovered on demolition day.

  3. Throughout, the work area is contained and cleaned daily. A kitchen remodel is disruptive by nature; leaving dust through the rest of the house makes it worse than it has to be.

Where we work

Kitchen Remodeling across the Twin Ports

Each service area page covers all twelve services and what makes building there different.

What homeowners say

Work that earns the referral.

Reviews left by Covenant Builders customers on Google.

  • “Went with Covenant Builders as they were the least expensive of 3 estimates. They did the roof on my house and garage in one 12 hour day with high quality products. Their cleanup was also great. I literally found just one nail after they were done. Roof looks great and so far has been leak free.

    Matthew ZemlerRoof replacement · via Google
  • “Jared was great to work with. Out of all the contractors that gave a bid on doing the roof of my house, he did the best inspection to help minimize surprise costs. He is professional, polite, and respectful. I had a great experience working with him!

    Abby DuggerRoof replacement · via Google
  • “I had an excellent experience from start to finish with Jared and Covenant builders. The estimate process was easy to understand; I new exactly what I was getting and what I would be paying for it, no pressure at all. The work crew was efficient and took extra care not to damage my garden. I look forward to saving monry on my homeowners insurance with class 4 rated shingles.

    Karen St. GeorgeRoof replacement · via Google

FAQ

Kitchen Remodeling questions

How long will my kitchen be out of service?

Most full remodels run several weeks, with the pacing item being cabinet lead time rather than site work. Sequencing matters: demolition, then any layout or mechanical changes, then cabinetry, countertops and finish work. Countertop templating happens after cabinets are set, which builds in a fixed wait.

Can I move the sink or the range?

Usually, though moving plumbing is more involved than moving electrical, and moving a range may mean rerouting gas and venting. On a slab or over a finished basement ceiling the drain relocation is the constraint. It is worth pricing the layout change against what it actually improves before committing.

Should cabinets be refaced or replaced?

Refacing makes sense when the boxes are solid and the layout is staying the same, and it costs meaningfully less. Replace when the boxes are damaged or particle board that has swelled, when the layout is changing, or when you want different sizes or interior fittings than the existing boxes allow.

What is the most common thing homeowners underestimate?

Decision volume and lead times. Tile, hardware, lighting, paint, fixtures and finishes each need a choice, and any one of them left open can hold up the schedule. Making selections up front, against the actual budget, is the single biggest factor in a remodel finishing on time.

Will the floor need to be replaced?

Not necessarily, but it depends on whether flooring runs under the existing cabinets. If it stops at the cabinet toe kick and the layout is changing, there will be gaps to address. That gets checked during planning rather than discovered on demolition day.

Ready to talk about kitchen remodeling?

Call, or send a few details about the property and we will get back to you with next steps.

Mon-Sat 7:00 am to 7:00 pm · Closed Sunday

Call CallBook a Consult